Chiam Jia Ern
Quantity
Surveying

Construction Technology 3
Lecturer : Mr Chiew Seng Khoon
The module progresses through the stages of dewatering in basement excavation where water table is high above the basement floor level; various types of retaining walls, drainage, roadwork, common industrialized building systems, curtain walls for multi-storey commercial buildings, façade system, prestressing involving pretension and post-tension method, bridge construction, tension membrane roof and steel roof trusses.
Video Group Assignment
We were required to choose a site and take the video of construction process in that site.This video project lasts around 20 minutes. This is a group assignment, we have six members. The group assignment is to produce a video project which proves a degree of accomplishment in each of the requirements identified in the detailed criteria and guidance.

Group photo of us.
Learning Outcome
In this assignment, we need to be able to identify and explain the construction process in this video including the machine which used in site and the materials used. Besides that, I was able to put theories that I learnt during lectures and tutorials into implementation as I was able to write out the script of the video and identify the construction process of the site.
Morever,this assignment help us to develop and reinforce our thinking and problem solving skills by thinking critically
in order for us to overcome each hurdles that we faced while accomplishing the project.When we face the difficult
things or problem,we can able to solve it.
Communication is the necessity for this assignment because this is a group assignment, we need to
communicate with other group member and discuss the details and contents of the video. It can improve our communicated skills and promote our relationship.