top of page

22/11/2014   Scholar@work - Alumni Welcome Party

 

I am a scholar in Taylor University Lakeside, so I have to work 84 hour to pay  back to school.This is the first event that I had participated.The objectives of event is to give the graduates an unforgettable and enjoyable graduation  memory,to gain awareness/branding through mouth of words/social media and to welcome the graduates as alumni member. This event is organized by Mr. Bryan. 

This is the decoration of Grand Hall.

I was an usher in this party. I really enjoyed in this party. I would like to thank Taylor for me the chance to participate this event and Mr.Bryan for organizing this party.This is a good experience to learn the communication skills and courageous to talk with a stranger. My communication skills has improved obviously. Besides that, I had known some new friends through this party, this expanded my circle of friends.

My friends and I 

I wore the formal wear in this party.

21/11/2014 Site Visit

 

          Miss Ang Fuey Lin ,Miss Asihah and Miss Azrina were the organizer of this site visit and we supposed to do an assignment that involves the three modules that is Measurement 1, Construction Technology 1, and Building Materials. We are only restricted at the perimeter around the construction site and not allowed to enter the building site because we are not covered under the insurance. The construction is under Pasukhas Construction Sdn Bhd and it located at Bandar Sunway which is besides the Taylor’s University Lakeside. It is going to build 2 block of 27-storey Soho Duplex and 28-storey of serviced apartments and others. Before the visit we were required to have safety helmet for precautions when visiting the site.

      

Task

 

Our task is basically to produce a report on the construction site based these few elements:-
(a) Objective 
(b) Content or Technical Observations
(c)  Photos and description
(d) Learning outcome or conclusion

The group photo of us

Photo with the contracter,Mr.Tang

The formwork of beam

The steel formwork of slab

Beam

Beam

This is the thick beam to support the load.

Pipes

Pipes

Pipes with different diameter are prepared on the floor and waiting to be installed.

Crane Tower

Crane Tower

My coursemates

My coursemates

Notice board

Notice board

There are some notice to remind us the importance of safety in the construction and hoarding for security to prevent unauthorised person access to site beside the main enterance.

meeting room

meeting room

The temporary meeting room on site.

Numbers of rebar waiting to be used,laid besides the building

10814360_869131406444182_919349712_n.jpg

10814360_869131406444182_919349712_n.jpg

Lift

Lift

Lift , it is prohibited to go inside because sometimes when they work upside , something will drop down and get hurt.

Mobile Acess

Mobile Acess

the leg of independent scaffolding

the leg of independent scaffolding

Reinforcement bar

Reinforcement bar

These are the 40mm diameter rebar inside the wall between two lift.There are always be the reinforced concrete used to the wall around the lift.

10811533_869132253110764_1899347080_n.jpg

10811533_869132253110764_1899347080_n.jpg

The adjustable steel prop scaffoding supported the formwork of slab.

Concrete block are kept on site.

Accommodation

Accommodation

Accommodation for workers to stay and rest

Concrete wall

Concrete wall

10807092_869132236444099_523340476_n.jpg

10807092_869132236444099_523340476_n.jpg

Smoking Area

Smoking Area

On site cannot smoke everywhere, smoking area is set for them smoking.

Independent scaffolding

Independent scaffolding

The stirrups using to tie the rebar together in beam and there some tying wire used to tie the stirrups together.

Mr.Tang

Mr.Tang

The contractor, Mr Tang , the person who are lead us to visit the site and he was briefing the safety and details of the building.

The worker is bending the rebar.

                      This trip help me to understand more of the things that I cannot learn in class and now I can more easy to image                           the actual thing when I study for. Besides that, I had  experience actual work and the working environment on site                      as a Quantity Surveyor through tis site visit. I learnt to apply what we study in class to the reality life and the                           actual work. This  allow us to have the awareness of importance of safety on site and understanding of safety                               problems and site condition

 

 

In addition,communication is the necessity for this assignment because this is a group assignment, we need to

communicate with other group member and ask the details of the building. It can improve our

communicated skills and promote our relationship.I also learnt how to communicate with the construction

team members on site and know the importance of teamwork in the building team.

 

04/10/2014  A Lecture about Green Card......

 

             Green card is an integrated program that involves the registration and accreditation of

Construction Personnel to enhance safety levels at Construction work sites. As a quantity

surveyor, we always need to go to sites, so we need the green card to enhance the safety.

This lecture is tell us about the aware of the importance a safe and healthy working place and 

provide a basic knowledge on safety and health at the Construction work site.

 

 

 

I would  like to express my gratitude to the lecturer to inform us the legal requirements in

relation to safety and health and tell us that I was automatically covered by a special Insurance

Scheme that insures the Construction Personnel against death and accidents when I work on

site as a quantity surveyor in future.

The lecturer

The group photo of us with the lecturer

Created by Chiam Jia Ern

bottom of page